For Your Critical Engineering Needs

PROJECTS:

SINCLAIR OIL CORPORATION

DESCRIPTION: Adequacy check of the existing structure for the extension of the stack on Five Heaters. Stack height was up to 80ft. The design was performed as per ASCE and AISC. Retrofitting methods were proposed to take care of the new loads.

 

FOSTER WHEELER ITALIANA

DESCRIPTION: FIS has been contracted by Total to evaluate the existing radiant section and the foundation for extension of the convection section. Engineering Alliance Inc. performed the adequacy check of the existing structure and foundation subjected to new loads resulting from new convection section.

 

CARNEGIE VANGUARD HIGH SCHOOL

DESCRIPTION: Carnegie Vanguard High School is a two storied school building situated in Houston, Texas. Engineering Alliance Inc. prepared the Building information model of the structure and prepared erection and fabrication drawings. EAI also performed design and detail of the stairs for this project.

 

COLUMBIA WASHING PLANT LIMITED

DESCRIPTION: Factory building of COLUMBIA WASHING PLANT LIMITED is a combination of 6 various Storied RCC & steel building. This building was designed as per BNBC 2006 Edition. Columbia Washing Plant authority engaged Engineering Alliance Inc. for performing Detailed Engineering Assessment.

 

FIBERGLASS PEDESTRIAN BRIDGE 70'L X 5'W

DESCRIPTION: Fiberglass 70'L X 5'W Pedestrian Bridge project was a part of Delaware Department of Natural Resources and Environmental Control, Division of Parks and Recreation. This Pedestrian Bridge was designed as per AASHTO (Guide Specifications for Design of Pedestrian Bridges).Engineering Alliance Inc. performed the structural design and structural detailing for this project.

 

FIBERGLASS ACCESS PLATFORM

DESCRIPTION: This project including 07 Fiberglass Access Platforms with ladder & 11 individual ladders for other platforms. Engineering Alliance Inc. performed the structural design and structural detailing for the HESS Stampede through Wood Group Mustang(WGM).

 

BHP BILLITON ANGOSTURA PHASE III INLET SEPARATOR

DESCRIPTION: This project including a two level platform with a grating stair and a caged ladder. Engineering Alliance Inc. performed the structural design and structural detailing for the FMC technologies through AIMS International.